EcoStud solves the problem of critical bolting

Written by: Paul Fanning | Published:

EcoStud combats fastener fatigue failures.

The EcoStud from Arnold Wragg, provides a cost effective answer to the safety risks caused by bolts and studs losing tension in operating conditions. It combats fastener fatigue failures and leaking joints by combining a high-quality fastener and an accurate tension controller within a single integral unit.
With bolt or stud failure regularly identified as the cause of serious problems such as leaks in petrochemical plant, maintaining the correct level of tension in studs has the potential to save money and significantly reduce safety risks.


This material is protected by MA Business copyright see Terms and Conditions.
One-off usage is permitted but bulk copying is not. For multiple copies contact the sales team.


Related Content

Websites


Companies

Arnold Wragg Ltd
Comments
Name
 
Email
 
Comments
 

Please view our Terms and Conditions before leaving a comment.

Change the CAPTCHA codeSpeak the CAPTCHA code